Title page
Contents
ABBREVIATIONS AND GLOSSARY 6
EXECUTIVE SUMMARY 8
INTRODUCTION 12
High-speed rail in Europe 12
The EU's high-speed rail network is growing in size and in rate of utilisation 12
EU policies for high-speed rail 14
Transport policy 14
Cohesion policy 15
EU support for building high-speed lines: significant, but a fraction of total cost 15
AUDIT SCOPE AND APPROACH 17
OBSERVATIONS 20
EU co-funded investments in high-speed rail can be beneficial, but there is no solid EU-wide strategic approach 20
High-speed rail is a beneficial mode of transport which contributes to the EU's sustainable-mobility objectives 20
The Commission's powers are limited, and its plan to triple the length of the high-speed rail network is unlikely to be achieved 21
Member States plan and decide on their national networks, leading to a patchwork of poorly connected national high-speed networks 23
Decision-making lacks reliable cost-benefit analyses 29
"Very high-speed" is not needed everywhere 29
Cost-efficiency checks are rare 31
Cost-benefit analyses are not used as a tool for decision-making in the Member States 33
Cost overruns, construction delays and delayed entry into service: a norm instead of an exception 35
A citizen's view: a real-life assessment of travel times, prices and connections, of passenger-services and of stations and their catchment area 38
Travel times and ticket prices, are important factors for success 38
Further improvements needed to rail ticketing, and in monitoring passenger-services data 41
The number and location of stations are both important 42
High-speed rail sustainability: effectiveness of the EU co-funding at risk 46
Passenger data analysis: three of the seven completed high-speed rail lines carry fewer passengers than the benchmark of nine million per year 46
Catchment-area analysis of the number of people living along the lines: nine of 14 audited high-speed lines and stretches do not have sufficient high number of potential passengers 47
The competitiveness of high-speed rail compared to other modes of transport: there is no "polluter-pays" principle yet 50
Seamless and competitive cross-border high-speed rail operations: not yet universal 51
With many barriers still existing, there is a long way to go before markets become open and competitive on high-speed lines in the EU 51
Track access charges: overly complicated, and a potential hindrance to competition 54
A strong and independent regulator: necessary, but not always a reality 57
CONCLUSIONS AND RECOMMENDATIONS 58
High-speed rail operations have many advantages but there is no realistic long term EU plan, and there is no truly EU high-speed network 58
The principles of sound financial management have not consistently been applied for the audited high-speed rail infrastructure investments 59
Assessing the situation for the EU citizens highlights the advantages of high-speed rail, while the sustainability of the EU co-funding to high-speed lines is at risk 59
Seamless and competitive cross-border high-speed rail operations are still some way off 60
ANNEX I. EUROPEAN HIGH-SPEED NETWORK MAP 65
ANNEX II. OVERVIEW OF HSR FUNDING SINCE 2000 BY MS AND MANAGEMENT MODE 66
ANNEX III. ANALYSIS OF PROJECTS 67
ANNEX IV. KEY HSR DATA PER MEMBER STATE 69
ANNEX V. SPEED YIELD ANALYSIS 70
ANNEX VI. A CITIZEN'S VIEW: ASSESSMENT OF TRAVEL TIMES, PRICES AND CONNECTIONS ON THE AUDITED HIGH-SPEED RAIL LINES: THE METHODOLOGY AND THE DATA 71
ANNEX VII. IMPACT OF STATIONS ON TRAVEL TIME AND SPEED 76
ANNEX VIII. MAP OF THE CATCHMENT AREA AND KEY DATA FOR EACH OF THE AUDITED HSLS, AS WELL AS FOR THE BORDER CROSSINGS ASSESSED 77
ANNEX IX. ANALYSIS OF STATIONS 91
REPLIES OF THE COMMISSION TO THE SPECIAL REPORT OF THE EUROPEAN COURT OF AUDITORS 92
Table 1. Overview of key financial data on audited projects 20
Table 2. Assessment of time from planning to operation 22
Table 3. Cost comparison of high-speed versus conventional rail: Venice - Trieste 32
Table 4. Cost of the audited high-speed line per km and per minute saved 33
Table 5. Overview of costs per km and comparison with estimates 36
Table 6. Door-to-door travel analysis on selected high-speed lines 40
Figure 1. Operational models for high-speed rail traffic 12
Figure 2. Length of national high-speed rail networks in the EU - growth over time 13
Figure 3. Overview of EU co-funding for high-speed rail by Member State (2000-2017) 16
Figure 4. Overview of audited lines (10 high-speed lines, four cross-border connections) 19
Figure 5. Differences in construction costs of high-speed lines 31
Figure 6. Station analysis of the Madrid-Barcelona-French border high-speed line 44
Figure 7. Catchment area analysis of the Madrid-Barcelona-French border high-speed line 48
Figure 8. Track access charge levels for selected origin-destination pairs in the EU 56
Boxes
Box 1. Poorly connected national networks, and their impact 25
Box 2. The operations of the Shinkansen 49
Box 3. The impact for travellers when there is no seamless travel of trains crossing borders 52
Pictures
Picture 1. Missing link at the border crossing on the Madrid-Lisbon high-speed line 27
Picture 2. Construction works on the Stuttgart 21 station 37
Picture 3. The Meuse TGV station 45
Picture 4. A Shinkansen train in Tokyo Central Station 49
Picture 5. Passengers waiting at Brenner station to continue their journey 53
Picture 6. All passengers must change trains at the border between France and Spain 54